School Logo
Login Button
Login Button

 

Innovation 
Building

INNOVATION Building 

The Innovation Building Program is a bold $23 million investment in the future of Hillcrest Christian College, designed to transform our campus with state-of-the-art facilities that support modern learning, advanced technology, and stronger community connections.

This project will create spaces that inspire creativity, collaboration, and growth, ensuring our students are equipped for the challenges of tomorrow. From cutting-edge technology labs to flexible learning areas, the Innovation Building reflects Hillcrest’s commitment to providing exceptional education in an ever-evolving world.

 Together, we can create a lasting impact and shape a brighter future for Hillcrest students and families.

Innovation starts here

This project, undertaken by Alder Constructions, has been carefully planned to ensure the highest quality outcome while navigating the complexities of building in a fully operational school environment. We deeply appreciate the patience and understanding of our students, families, and staff as we work through the challenges of this significant investment in our community’s future.

To stay informed, we encourage families to visit Connex for the latest updates, including construction maps, student movement plans, parking arrangements, and the progress of each building stage.

Thank you for your ongoing support as we create a world-class facility that will enrich learning outcomes for generations to come.

Landscaping

Integrated Landscaping and Accessibility 

The integrated landscaping around the new development is thoughtfully designed to enhance the natural beauty of the College while prioritising functionality and accessibility. With mature trees providing shade and a welcoming atmosphere, the area reflects a harmonious balance between nature and modern infrastructure.

Improved mobility access ensures that all students, staff, and visitors can easily navigate the campus, with seamless entry points and pathways guiding them effortlessly into the heart of the College.

Additional play space and seating is incorporated into the design to allow students to enjoy the outdoors during their break.


Build Stages

Construction Stages

The construction of Hillcrest’s Innovation Building is a complex and exciting project with several key stages to bring this state-of-the-art facility to life.

Below is an outline of the major construction milestones: Due for completion for the start of Term 1, 2026.

Stage 1: Site Preparation and Crane Installation

  • Initial groundwork, site clearing, and preparation.
  • Installation of a large crane to safely and efficiently move steel and other heavy building materials onto the site.
  •  Implementation of safety measures, including the closure of Chocolate Drive and surrounding walkways, to ensure the safety of students, staff, and visitors during this phase.
  • Earthwork and the crane construction is the major development which will require trucks and selected concrete pours.

Stage 2: Structural Framework

  • Construction of the building’s steel framework and various structural levels.
  • Careful coordination to ensure the build progresses efficiently while minimising disruption to the school’s operations.
  • This phase will commence from Term 2 - 2025.

Stage 3: External Façade and Solar Panel Installation

  • Construction and installation of the outer façade to give the building its modern, innovative look.
  • Addition of solar panels to promote sustainability and reduce the College’s environmental footprint.

Stage 4: Internal Fit-Outs

  • Development of internal spaces, including TV and film production studios, podcast rooms, fabrication labs, and visual arts gallery spaces.
  • Installation of cutting-edge technology and furnishings to create purpose-built environments for learning and creativity.
  • This phase will be in Term 3-4, 2025

Stage 5: Finishing Touches and Opening

  • Final inspections, landscaping, and completion of walkways and access points.
  • Reopening of Chocolate Drive and surrounding areas once it is safe.
  • Official opening of the Innovation Building, ready to inspire students and enhance the Hillcrest learning experience.
  • This phase will be in Term 3-4, 2025.

Stage: One - TimeLapse

The initial works for Hillcrest Christian College’s Innovation Building are now underway, marking an important step in bringing this new facility to life. This stage includes excavation, site clearing, and groundwork preparation, ensuring a solid foundation for the structure. A large crane has been installed, allowing for the safe and efficient movement of steel and other heavy materials as construction progresses.

To prioritise safety, Chocolate Drive and nearby walkways have been temporarily closed, with measures in place to minimise disruption while maintaining access where possible. Earthworks and concrete pours are also a key focus during this phase, with trucks and construction crews working diligently to prepare the site.

We appreciate the patience and support of our school community as we lay the groundwork for a facility that will enrich learning at Hillcrest for generations to come.


Innovation Building Details




Modern Teaching and Learning Environments

Hillcrest’s open learning spaces are designed to foster modern teaching and learning environments, enabling personalised content delivery tailored to individual student needs. These versatile areas support a range of activities, from large group instruction to small group collaboration and independent study.

By prioritising flexibility and adaptability, these spaces empower students to engage deeply with their learning, promoting creativity, critical thinking, and collaboration.

Where Imagination Meets Innovation

The facility includes two large open spaces that can be used in flexible and innovative ways for activities such as performances, art gallery, conferences, robotics, group activities. It is this flexible design that is a feature of the design throughout the building.

Virtual Tours

Internal - Level 2 Technology

This cutting-edge space also supports the College’s Entrepreneurship and Design-Centred Learning programs, integral to the College’s SHIELD framework. The facilities on Level 2 of the Innovation Building provide state-of-the-art digital tools and an environment for students to engage deeply with technology, empowering them to explore, design, and experiment in meaningful and impactful ways


Internal - Level 3 & 4

The Innovation Building’s internal spaces are designed to inspire creativity, collaboration, and hands-on learning. Featuring cutting-edge facilities such as TV and film production studios, podcast recording rooms, advanced fabrication labs, and flexible learning zones, the building offers students unparalleled opportunities to explore their passions.

A dedicated gallery and exhibition space allows students to showcase their work, fostering confidence and pride in their achievements. With modern technology integrated throughout, the Innovation Building is a hub for imagination, innovation, and future-focused education.

External - Outside

The Innovation Building is thoughtfully designed to harmonise with its surroundings while serving as a central hub within the College. Conveniently located at the heart of the campus, it is nestled between the main entrance, administration, resource centre, and the Middle and Senior Learning Communities.

Its strategic position maximises both functionality and aesthetic appeal, with large gallery windows offering stunning views of the oval and the iconic eucalyptus trees that frame the College.

The exterior features natural cladding in earthy tones, blending seamlessly with the native environment, while sustainability remains a priority. The design incorporates carefully positioned windows to minimise heat from direct sunlight while allowing filtered light to fill the spaces.

A central skylight, surrounded by solar panels on the roof, further enhances energy efficiency. Surrounding works will improve mobility and connectivity, providing easier access through the heart of the College for students and families, making this space both functional and inspiring.

Other Projects

Discover the exciting Other Projects transforming the Hillcrest campus, including the upgraded and integrated canteen and hospitality area, offering students a modern, central space to dine and connect, and the purpose-built Virtual Learning Pods, designed to foster collaboration, creativity, and deep work for both teachers and students.

These innovative additions, alongside other key developments, are enhancing the learning experience and creating vibrant spaces for the entire Hillcrest community.


*Coming Soon*




"Our collaboration with the Hillcrest Christian College on this new 4-storey purpose designed Innovation Building represents a significant investment for the College and will benefit their Community in all areas of education and innovation which will certainly be a leading-edge facility within the state."

Established by Lisa and Matt Martin in 2007, Detail Studio is a collaborative Adelaide-based practice that brings ‘the vision’ to life with sustainably and socially conscious architecture.  Detail Studio boasts a diverse portfolio spanning the educational, commercial, health, interiors, retail, and residential sectors. The studio is committed to ensuring that every project reflects a thoughtful, impactful approach to design and the people who use it.

Government support


 The Queensland Government have partially funded both our Innovation Building and our Refurbishment Program to create a new canteen and hospitality facility. These grants have assisted us to construct, convert, refurbish and upgrade our facilities. 


The College acknowledges the $2,100,000.000 government grants provided towards the cost of these projects. 

These grants will be formally acknowledged with the unveiling of a plaque on each building as part of the opening ceremonies.

(07) 5593 4226  
21 Bridgman Drive, 
Reedy Creek, QLD 4227 Australia
ACN 010 381 334  I  ABN 68 947 459 366  
CRICOS No. 01043C

 








© 2025 Hillcrest Christian College
All Rights Reserved


Log into Connex for up to date 
Parent Information, resources and updates.